Replacement of the drinking water line for the North Refineries Company 800MM U-PVC SOCKET JOINT PIPE, PN10, STANDARD EN1452-2 S=30.6MM.

Project location :IRAQ - Baiji

Client :MINISTRY OF OIL/NORTH REFINERIES CO. (ش.ع)شركة مصافي الشمال

Contract Value (US$) :(US$):

Contract Duration: 360 Days

Contract Start Date:2023-01-13

Contract Completion2023-10-19

Scope of work:-

AL KHATAB AL MUTAHIDA Co. had been contracted with (MINISTRY OF OIL/NORTH REFINERIES CO. (ش.ع)شركة مصافي الشمال) Replacement of the drinking water line for the North Refineries Company 800MM U-PVC SOCKET JOINT PIPE, PN10, STANDARD EN1452-2 S=30.6MM.According to the contract requirements and BoQ.

The contract contains the following activities:

  1. Preparing the site, determining the path for the pipeline by using the total station device, and removing all obstacles and waste.
  2. All section Excavation in Soft through Hard soil (0 to 2 m depth) throughout the plant considering use of hydraulic excavators, shoring as required and hauling up to stock pile (Within 11 km).

  3. Supplying And Installing 800mm U-Pvc Socket Joint Pipe, Pn10, Standard: En1452-2 S=30.6mm, With Socket And Rubber Ring, Color: Dark Grey, Effective L (W/Out Socket) = 6m.(11 km)

  4. Supplying and installing PVC Elbow 90° with a diameter of 32 inches.

  5. Construction Box culverts in shape (U) With a sliding roof with dimensions (2*2*8) meters.

Photos

Projects
Send us a message

Our Contacts

Address

AI-Zwyia-Baiji, Salahuddin - Iraq 126 English Village, Erbil - Iraq

Al-Mutanaby
neighborhood - Baghdad - Iraq

Al-Baradya zone - Basra - Iraq


Email

info@alkhatabco.com 

alkhatab.almutahida@gmail.com


Mobile

009647708506005

009647517106759

009647834140505