Supply, Install, and Operate the Pumps for Al Massaref Boosting Station
Project location :Ninawa province
Client :Nineveh Water Directorate
Contract Value (US$) :(US$):
Contract Duration: 6 Months
Contract Start Date:2011-02-01
Contract Completion2011-06-20
Scope of work:
The contract contains the following activities:
- CIVIL WORKS, Clearing, grubbing, stripping and levelling, Backfilling works for internal roads, painting, DUCTILE PIPE LINE, Excavation and backfilling, Ductile Iron Pipe Ø400mm, ELECTRICAL WORKS, Transformer (1000 KVA), Power Cable (1Core*300mm²), Generator (1300 kVA-Prime), MECHANICAL WORKS, Supply, install and test set of submersible pumps.