Project location :ERBIL KURDISTAN IRAQ. اربيل بحركة
Client :Biltek Uluslararasi Insaat Limited Sirketi.
Contract Value (US$) :(US$): 0
Contract Duration: 90 Days
Contract Start Date:2022-09-20
Contract Completion2022-12-18
Scope of work:
- Reinforced Concrete Cylindrical/cubical strength - RCC (C28/C35) using SRC in foundation, skid bases, etc.; reinforcement included formwork (shoring as required), supplying, pouring, vibrating and installation.
- Coats of bitumen coating for all concrete surfaces in contact with soil and 2 coats of Deckguard S6 for AG concrete surfaces, surface preparation for grouting, handling and construction equipment etc.
- Footing.
- Large Block Large Compressors, 3-25 CY [2.3-1.9 M3].
- Masspour Shapes - 25 CY [19 M3] minimum.
- Oct+Proj.
- Octagonal.
- Paving,Pier,Ring,Slab GRD,Wall.